Capital Project

On December 11, 2025, district residents will be asked to approve a capital improvement project in the amount of $43,605,000.  The project consists of mainly renovations to all buildings, along with parking and athletic field renovations.  Below, please find a summary of the project scope:

Intermediate – Jr/Sr High School
·         Exterior door replacement
·         Masonry restoration and waterproofing
·         IS corridor and classroom renovations
·         HS cafeteria floor and ceiling
·         Refinish field house and old gym floors
·         IS gym wall pads, acoustics, and bleachers
·         HS gym bleachers
·         IS old locker room abatement and renovation
·         Replace classroom unit ventilators with DOAS units
·         Provide AC for data and electrical rooms
·         Replace HS cafeteria AC
·         Add AC to field house
·         Replace failed chiller
·         LED lighting in corridors and classrooms
·         Replace classroom doors, add keyless access controls
·         Repave bus parking lot, install conduit for potential EV mandate
·         Baseball field drainage
·         Softball field drainage
·         Replace grass soccer field inside track with artificial turf

Elementary School
·         Exterior door replacement
·         Replace classroom doors, add keyless access controls
·         Add AC to ES cafeteria
·         Add DOAS units to ES classrooms
·         LED lighting in corridors and classrooms
·         Update electrical service due to AC
·         Pave back parking lot
·         Miscellaneous concrete sidewalk work

For information on Absentee and Early Mail Ballot applications click on this link and scroll down under "Board Links and Information" on the left: https://www.soduscsd.org/page/board-of-education